Licensed California General Contractor CSLB 1037532 Custom Homes, ADUs & Additions Across LA & Ventura Counties

ADU Construction · Pasadena

ADU Construction in Pasadena, CA

Detached backyard cottages and attached ADUs for Pasadena homes, designed to suit the main house, respect protected trees and move smoothly through city review.

  • Licensed California general contractor
  • Permits with the City of Pasadena
  • Written, line-item estimates
  • Design, engineering & construction

Free ADU Construction Estimate in Pasadena

Tell us about your project. We will call you to talk it through and schedule an on-site visit.

Prefer to talk? Call (626) 824-8888

Pasadena, CA

ADU Construction for Pasadena Homeowners

Homeowners pursue ADU construction in Pasadena for many reasons: rental income, a cottage for a parent, or a quiet studio with its own kitchen and bath. Simply Construction coordinates design, permits and construction under one contract, and we design each accessory dwelling unit to belong on its lot and alongside the main house.

In a city known for its architecture, a backyard unit that looks like an afterthought is a missed opportunity. We aim for cottages and attached units that feel as though they were always part of the property.

L-shaped kitchen with wood shaker cabinets, green tile backsplash and quartz counters

Local Knowledge

Building an ADU in Pasadena

Pasadena applies its own ADU ordinance within the framework of state law. The city has 60 days to act on a complete application and cannot block an 800 square foot unit that keeps 4-foot side and rear setbacks. Detached ADUs can reach 16 feet in height, or 18 feet within a half mile of major transit, and Pasadena's Metro A Line stations put some lots within that range. The city's free ADU Standard Plans expired at the end of 2025 and are now limited to lots red-tagged in the Eaton Fire.

Placement is often driven by trees and driveways. Older lots in Bungalow Heaven, Madison Heights and Garfield Heights commonly have a long driveway leading to a detached garage at the rear, with mature trees in the back yard. The city's tree protection ordinance can make a protected oak the deciding factor in where a unit goes.

On landmark district or designated properties, we design the ADU's scale, roof and materials to complement the main house. Pasadena's 2024 ordinance asked that larger new ADUs on those properties stay out of view from the street where that doesn't prevent the unit, so placement and height get settled early.

Open kitchen and great room with tile floors, a slatted wood wall and sliding doors
Crew pouring a concrete slab over rebar and vapor barrier
Detached ADU with white vertical siding beside a new lawn
Rebar grid over a yellow vapor barrier inside slab forms

What's Included

From Site Study to Final: Pasadena ADU Scope

  • Lot analysis of setbacks, protected trees, driveway access and distance to Metro stations
  • ADU design coordination that complements the main house's architecture
  • Application package, city correspondence and plan check revisions handled by our team
  • Electrical load calculations and any service upgrade request to Pasadena Water and Power
  • Engineered slab or raised foundation, framing, roofing and energy code compliance
  • Interior build-out, from kitchen cabinetry and bath tile to flooring, through final inspection

For the full scope, process and options, see our main ADU construction page, or browse everything we build on our Pasadena service area page.

Planning Considerations

Choosing the Right ADU for a Pasadena Lot

Detached cottage or attached unit

A detached cottage behind the house offers the most privacy and fits the bungalow court tradition Pasadena is known for. An attached ADU can share existing walls and utilities and, under state law, may rise higher than a detached one. On a narrow lot with a protected tree in the back yard, attaching the unit is sometimes the only practical choice.

Design that fits the setting

A backyard unit behind a Craftsman bungalow looks right with a similar roof pitch, exposed rafter tails and wood siding, while one behind a Spanish revival home suits plaster walls and tile. We carry those cues into the ADU so it complements the house, which supports long-term value and makes review more straightforward for everyone involved.

Getting utilities to the back of the lot

Sewer, water and electrical lines have to reach the ADU, often along the full length of a long driveway. Routing them around protected tree roots takes careful planning and sometimes directional boring instead of open trenches. We map the routes early, confirm electrical capacity, and show utility work as a clear part of the estimate.

Why Choose Us

Why Pasadena Homeowners Choose Simply Construction

Licensed, Bonded and Easy to Verify

Simply Construction inc. is a licensed California general contractor, CSLB 1037532. State law requires a license for any job of $1,000 or more, or any job that needs a building permit, and every licensee must carry a $25,000 contractor bond. Anyone can check a contractor's license, bond and workers' compensation status on the CSLB website in about a minute. We encourage every Pasadena homeowner to do exactly that before signing with anyone, including us.

Permits Handled With the City of Pasadena

Most delays on large residential projects start at the permit counter. We prepare the drawing set, coordinate structural and Title 24 energy calculations, answer plan-check comments and schedule inspections with the City of Pasadena, so you are not the one chasing corrections. For ADUs, state law requires the agency to act on a complete application within 60 days, and a complete, well-coordinated submittal is what starts that clock.

Built to Current California Energy Code

New homes and ADUs in California are built to the Title 24 energy code, which has required solar PV on most new single-family homes since 2020, and permit applications filed on or after January 1, 2026 fall under the 2025 Energy Code. We plan insulation, windows, mechanical systems and solar into the design from the start instead of treating compliance as a late fix.

FAQ

ADU Construction in Pasadena: Common Questions

How quickly can Pasadena approve an ADU?

California gives the city 60 days to act once an ADU application is complete. Incomplete submittals and missing reports can hold up the start of that clock, and tree protection or historic review can add steps on some lots. We assemble arborist and design information before submitting so the review begins on solid footing.

Will historic status stop me from adding an ADU?

Generally, no. California law permits ADUs on historic properties while leaving cities room for protective standards, and Pasadena's ordinance has favored placing larger units out of street view on designated lots. In a landmark district, we design the unit to respect the scale, materials and character of the main house, placing it where it has the least visual effect on the street.

How tall can my ADU be?

Under state law, detached ADUs can reach 16 feet, or 18 feet within a half mile of major transit, plus up to 2 more feet to match the main house's roof pitch. Attached ADUs can reach 25 feet or the main house's height limit, whichever is lower. We confirm the limits that apply to your lot.

Start Your Project

Planning an ADU in Pasadena?

Tell us about your property and goals. We will walk the site, flag anything the City of Pasadena will care about, and give you a written, line-item estimate.

Licensed California General Contractor · CSLB 1037532